1.
|
In
the Hidalgo County, Texas Irrigation District
# 1 (Edinburg),
a pipeline project identified in the Meldon
& Hunt, Inc. engineering study dated
July 6 , 2000 as the Curry Main Pipline
Project.
|
|
|
2.
|
In
the Cameron County, Texas La
Feria Irrigation District # 3 ,
a distribution system improvement project
identified by the 1993 engineering study by
Siger , Winston , Greenwood and Associates,
Inc. (Documents)
|
|
|
3.
|
In
the Cameron County, Texas Irrigation District
# 2 (San Benito),canal
rehabilition and pumping plant replacement
as identified as Job Number 48-05540-002 in
a report by Turner Collie & Braden , Inc.
dated August 12 , 1998.
(Documents) |
|
|
4.
|
In
the Cameron County, Harlingen
Irrigation District # 1 , a project of meter
installation and canal lining as identified
in a proposal submitted to the Texas Water
Development Board dated Apirl 28 ,2000. (Documents) |
| |
2001
-
In
the United Irrigation District of Hidalgo
County , Texas , a pipeline and
pumping system as identified in the
Sigler , Winston , Greenwood , &
Associates , Incorpated study dated
January 2001.
-
In
the Cameron County, Texas Irrigation
District No. 2 (San
Benito), proposed improvements Canal
"C", as identifed in February
8, 2001 engineering report by Morton
, Brown , and Perez.
-
In
Cameron County ,Texas Irrigation District
No. 2 (San
Benito),a proposed Canal "C"
& Canal 13 Inner Connect ,as identified
in the February 12 , 2001 engineering
report by Martin , Brown , and Perez.
-
In
Delta Lake Irrigation District
of Hidalgo and Wallacy Counties ,Texas
, proposed water conservation projects
, as identified by the AW Blair Engineering
report of February 13 ,2001
-
In
the Hidalgo and Cameron County
,Texas Irrigation District No. 9 (Mercedes),
a proposed project to salvage spill
water using automatic control of canal
gates as identified in the AW Blair
Engineering report dated February 14
, 2001.
-
In
the Brownsville Irrigation District
of Cameron County , Texas ,a proposed
main canal replacement as outlined in
the Holdar-Garcia & Associates engineering
report dated Feburary 14 , 2001.
-
In
the Hidalgo County ,Texas Irrigation
District No. 16 (Mission 16), a proposed
off-district pump station project as
identified by the Meldon & Hunt
, Incorpated engineering report dated
Feburary 14 , 2001.
-
In
the Hidalgo County , Texas Irrigation
District No. 1 (Edinburg),
a proposed canal replacement of the
North Branch East Main, as outlined
in the Melden and Hunt, Incorporated
engineering analysis dated Feburary
, 2001.
-
In
the Donna (Texas) Irrigation District
, a proposed improvement project as
identified by the Melden & Hunt,
Incorporated engineering analysis dated
Feburary 13 , 2001.
-
In
Hudspeth County ,Texas Conservation
and Reclamation District No. 1, the
Alamo Arroyo Pumping Plant water quality
project as identified by the engineering
report and drawings by the Gebhard-Sarma
and Associates dated July 1996 and the
construction of a 1,000 acre- foot off-
channel regulating reservoir for the
capture and conservation of irrrigation
water , as identified in the engineering
report by AW Blair Engineering dated
March, 2001.
-
In
El Paso County, Texas Water Improvement
District No. 1, the Riverside Canal
Improvement Project Phase 1 Reach A,
a canal lining and water conservation
project as identified by the engineering
report and drawing by AW Blair Engineering
dated November, 1999.
-
In
Maverick County, Texas Water Improvement
and Control District No.1, the Concrete
Lining Project of 12 miles the Maverick
Main Canal, identified in the engineering
report by AW Blair Engineering dated
March of 2001.
-
In
Hidalgo County Irrigation District No.
6 (Mission 6) -Rehabilitation 10.2 miles
of concrete lining in the main canal
between lift stations No 2 and 3 as
identified in the engineering report
by AW Blair Engineering dated March,
2001.
-
In
Hidalgo County Irrigation District No.
2 (San
Juan), Wisconsin Canal Improvements
as identified in the Singler, Winston,
Greenwood & Associates, Inc. engineering
report dated February, 2001.
15. In
the Hidalgo County, Texas, Irrigation District
No. 2, Lateral `A' Canal Improvements as
identified
in the Sigler, Winston, Greenwood &
Associates, Incorporated, engineering
report dated July 25, 2001.
|
|
|