|
|
May 16, 2012
District Projects
(Pages
Under Construction)
|
|
|
|
Only the Lower
Rio Grande Valley Water Resources Conservation and
Improvement Act of 2000 has been authorized
at this time.
Project Implementation.--If
the Secretary determines that any of the following
projects meet the review criteria and project requirements
(Guidelines), as
set forth in section 3 , the Secretary may conduct
or participate in funding engineering work, infrastructure
construction, and improvements for the purpose of
conserving and transporting raw water through that
project:
|
|
| |
|
|
|
|
1.
|
In
the Hidalgo County, Texas Irrigation District
# 1 (Edinburg),
a pipeline project identified in the Meldon
& Hunt, Inc. engineering study dated July
6 , 2000 as the Curry Main Pipline Project.
|
|
|
2.
|
In
the Cameron County, Texas La
Feria Irrigation District # 3 , a
distribution system improvement project identified
by the 1993 engineering study by Siger , Winston
, Greenwood and Associates, Inc.
(Documents)
|
|
|
3.
|
In
the Cameron County, Texas Irrigation District
# 2 (San Benito),canal
rehabilition and pumping plant replacement as
identified as Job Number 48-05540-002 in a report
by Turner Collie & Braden , Inc. dated August
12 , 1998.
(Documents) |
|
|
4.
|
In
the Cameron County, Harlingen
Irrigation District # 1 , a project of meter
installation and canal lining as identified
in a proposal submitted to the Texas Water Development
Board dated Apirl 28 ,2000. (Documents) |
| |
2001
-
In
the United Irrigation District of Hidalgo
County , Texas , a pipeline and
pumping system as identified in the Sigler
, Winston , Greenwood , & Associates
, Incorpated study dated January 2001.
-
In
the Cameron County, Texas Irrigation
District No. 2 (San
Benito), proposed improvements Canal
"C", as identifed in February
8, 2001 engineering report by Morton ,
Brown , and Perez.
-
In
Cameron County ,Texas Irrigation District
No. 2 (San Benito),a
proposed Canal "C" & Canal
13 Inner Connect ,as identified in the
February 12 , 2001 engineering report
by Martin , Brown , and Perez.
-
In
Delta Lake Irrigation District
of Hidalgo and Wallacy Counties ,Texas
, proposed water conservation projects
, as identified by the AW Blair Engineering
report of February 13 ,2001
-
In
the Hidalgo and Cameron County
,Texas Irrigation District No. 9 (Mercedes),
a proposed project to salvage spill water
using automatic control of canal gates
as identified in the AW Blair Engineering
report dated February 14 , 2001.
-
In
the Brownsville Irrigation District of
Cameron County , Texas ,a proposed main
canal replacement as outlined in the Holdar-Garcia
& Associates engineering report dated
Feburary 14 , 2001.
-
In
the Hidalgo County ,Texas Irrigation District
No. 16 (Mission 16), a proposed off-district
pump station project as identified by
the Meldon & Hunt , Incorpated engineering
report dated Feburary 14 , 2001.
-
In
the Hidalgo County , Texas Irrigation
District No. 1 (Edinburg),
a proposed canal replacement of the North
Branch East Main, as outlined in the Melden
and Hunt, Incorporated engineering analysis
dated Feburary , 2001.
-
In
the Donna (Texas) Irrigation District
, a proposed improvement project as identified
by the Melden & Hunt, Incorporated
engineering analysis dated Feburary 13
, 2001.
-
In
Hudspeth County ,Texas Conservation and
Reclamation District No. 1, the Alamo
Arroyo Pumping Plant water quality project
as identified by the engineering report
and drawings by the Gebhard-Sarma and
Associates dated July 1996 and the construction
of a 1,000 acre- foot off- channel regulating
reservoir for the capture and conservation
of irrrigation water , as identified in
the engineering report by AW Blair Engineering
dated March, 2001.
-
In
El Paso County, Texas Water Improvement
District No. 1, the Riverside Canal Improvement
Project Phase 1 Reach A, a canal lining
and water conservation project as identified
by the engineering report and drawing
by AW Blair Engineering dated November,
1999.
-
In
Maverick County, Texas Water Improvement
and Control District No.1, the Concrete
Lining Project of 12 miles the Maverick
Main Canal, identified in the engineering
report by AW Blair Engineering dated March
of 2001.
-
In
Hidalgo County Irrigation District No.
6 (Mission 6) -Rehabilitation 10.2 miles
of concrete lining in the main canal between
lift stations No 2 and 3 as identified
in the engineering report by AW Blair
Engineering dated March, 2001.
-
In
Hidalgo County Irrigation District No.
2 (San
Juan), Wisconsin Canal Improvements as
identified in the Singler, Winston, Greenwood
& Associates, Inc. engineering report
dated February, 2001.
15. In
the Hidalgo County, Texas, Irrigation District
No. 2, Lateral `A' Canal Improvements as identified
in the Sigler, Winston, Greenwood & Associates,
Incorporated, engineering
report dated July 25, 2001.
|
|
|
|
|
|
©2006
|
|